Over 2300 Job-Specific and All-Purpose Magnetic Whiteboard Kits
Made in USA flag

Critical Path Mapping CPM-ProjectBoard Magnetic Dry-Erase Whiteboard with CPM Symbols

3 sizes for 13, 26 or 39 activities

Do your project team members really see the critical path to your project deadline? This board shows it. It gives your team the tool to break complex projects down to show and find the most efficient, easiest and fastest path to completion.

Critical path mapping, like earlier Gantt and PERT Charts, targets project finish dates, prioritizes activities and shows the obstacles to meeting deadlines and completion dates while motivating your team. You see and track at-a-glance the critical path of work to be done, under way, who's doing it and the work that's critical to the project's completion.

Big 3" x 3" magnetic cardholders in 5 colors show the CPM activity nodes positioned on the black tape project map timelines with the critical path plotted in bold red tape. (See How it Works below.) The upper mapping section of the board has a faint Ghost-Grid background for neatly displaying your map. The itemized, color-coded, numbered, activity line-item list table on the lower half displays activity subjects, start and finish times and color-flags the critical activities. You can also write on the board in 4 colors with the dry-erase pens and make fast changes by moving magnets. It's completely flexible for tailoring the map to show your exact project critical path.

If you would like some help from one of our experienced design specialists, please contact us or call us at 800 624 4154 or email us at sales@magnatag.com
At NO extra cost, Using our Design-it Editing tool, you can personalize titles and headers on your board. To access the tool look for the symbol before adding the item to your cart
Product code: CPM
Share with Email Tweet Share Share 
Ships in 5 business days or less!
17910623458
1
1/2" Ghost-Grid for a neat presentation. Visible up close, but "disappears" when you step back a little.
2
Dry-erase pens in 4 colors to write anywhere on the board.
3
Lettered Activity Rows
4
Magnetic 1" x 6" cardholders in 5 colors and card inserts in 10 colors for up to 50 color-combination codes. Use them to post activity name. Card color can match node magnet and insert color.

Download your card-keying templates here.
5
Magnetic 3/8" status signals in 10 colors can show critical path, or use them to flag other data.
6
Data posting area to plan, track, and post earliest and latest activity start and finish, preceding activities, and activity duration.
7
3" magnetic circle printed node symbols (5 colors) for quick, card free mapping. Use damp or dry-erase pens.
8
Write activity data in the card node diagrams:
ES = Earliest Start
EF = Earliest Finish
LS = Latest Start
LF = Latest Finish
A = Activity Letter Code
D = Activity Duration
9
3" x 3" cardholders in 5 colors can show department, assignee, etc. Cards in 10 colors can show activity subject.
10
Charting tape in 4 colors to lay out critical path mapping.

Order Here

Capacities, sizes and options
Board h x w# of activities
3' x 4'13
4' x 6'26
4' x 8'39
CPM3948M
#CPM3948M
QuantityPrice
One1 @ $1,609
2 - 41 @ $1,562
5 - 91 @ $1,512
10 - 241 @ $1,463
25 +1 @ $1,416
Specifications
  • Board h x w: 4' x 8'
  • # of activities: 39
  • Board Option: BoldLyne Frame
  • Frame Option: Silver

What comes with this item

CPM3948B
Qty: 1

Critical Path Mapping 4' x 8' Whiteboard for up to 39 actvities

Qty: 75

Magnetic cardholders, 3" x 3", 5 colors: White, Yellow, Blue, Green, Red

Qty: 4

Packages of 10 sheets (240 total) card inserts in 10 colors perforated 6-up to fit Magnatag #CH33 3" x 3" cardholders

Qty: 3

Packages of 10 sheets10 card inserts with PRINTED NODE SYMBOL in 10 colors perforated 6-up to fit Magnatag #CH33 3" x 3" cardholders

Qty: 30

Magnetic cardholders, 1" x 6", 5 colors: White, Yellow, Blue, Green, Red

Qty: 3

Packages of 10 sheets (360 total) card inserts in 10 colors perforated 12-up to fit Magnatag #CH16 1" x 6" cardholders

Qty: 30

Magnet circle, damp/dry finish, 3" dia. 5 colors, (yellow, white, tan, light blue, pink)

Qty: 30

CPM Node, 3" magnet circles, damp/dry finish, 5 colors, (yellow, white, tan, light blue, pink)

Qty: 100

Magnet circle status signals, 3/8" dia. 10 colors

Qty: 4

Rolls of 1/8" x 324" PreciseLine® removable-adhesive bold line chart tape, Black

Qty: 4

Rolls of 1/4" x 324" PreciseLine® removable-adhesive bold line chart tape Black

Qty: 5

Rolls of 1/4" x 324" PreciseLine® removable-adhesive bold line chart tape Red

Qty: 4

Rolls of 1/8" x 324" PreciseLine® removable-adhesive bold line chart tape, Red

Qty: 2

Rolls of 1/8" x 324" PreciseLine® removable-adhesive bold line chart tape, Blue

Qty: 2

Rolls of 1/8" x 324" PreciseLine® removable-adhesive bold line chart tape, Green

Qty: 1

Set(s) of 122 press-on 3/4" vinyl die-cut capital black letters (removable, not reusable)

Qty: 1

Set(s) of 125 press-on 3/4" vinyl die-cut black numbers (removable, not reusable)

Qty: 1

Magnetic ChartJackets®,vertical letter-size 11"h x 8-1/2"w, White

Qty: 1

Magnet Storage Box, transparent plastic, 13" x 9" x 2"

Qty: 2

Set(s) of 4 Dry-Erase Bullet-point board markers, 4 colors: Black, Red, Green, Blue

Qty: 1

Set(s) of 4 Dry-Erase chisel-point board markers, 4 colors: Black, Red, Green, Blue

YEF-K
Qty: 2

Black Dry-Erase Fine Point pen

Qty: 1

8 oz. pump-spray bottle of PandaBoard® Brand Whiteboard Cleaner and Conditioner

Qty: 1

Whiteboard Combination PandaBoard® Brand Felt Eraser and Pen-holder that magnetically clings to the steel board surface. Up to 4 pens clip into the eraser. Patented.

Qty: 1

Pack of 5 large lint-free board wipes

Qty: 1

Pkg of 2 WakTack® Rare Earth Magnets for tacking paper notes on the board, 2 colors. Patented.

Options

  • Board Option
    • FRM1
      FRM1
      BoldLyne Frame
      SELECTED
    • ZV
      ZV
      Roll-Around Stand, 1-sided
      + $1,139
    • ZV2
      ZV2
      Roll-Around Stand, 2 sided
      + $1,729
    • NRX
      NRX
      BoldLyne Frame with File Rack
      + $255
    • TAC
      TAC
      Frame w/ TackStrip
      + $169
  • Frame Option
    • S
      S
      Silver
      SELECTED
    • K
      K
      Black
  • Frame Option
    • TYA
      TYA
      6' Accessory Tray
      + $79
  • Frame Option
    • MPR
      MPR
      Map Rail w/ Cork Strip
      + $132
    • ESL
      ESL
      (2) Folding 4-leg Safety Easels
      + $669
    • AK
      AK
      Privacy Screen
      + $739
    • PV
      PV
      PlanView SlidePanel

FAQs

Frequently asked questions about this product
What is included with my magnetic whiteboard?
Each whiteboard system offers one or more kit options tailored specifically for that system. Each includes the same high quality, magnetic dry-erase whiteboard. To view and compare the contents of each kit option, select the board item(s) in the Price Chart above and click the “What’s Included” tab.
What options are available for my magnetic whiteboard?
For a list of available board options, including: factory installed board trays, frame color choices, stands and other options, select the board item in the price chart above and scroll to the “Features & Options” tab.
How do I hang my new board?
Your BoldLyne® framed Magnatag® board comes with two hanging options: Patented Safety Hooks and FrameKlamp SlideChannel wall hangers. You can view an installation video of the two options or download the instructions for either by clicking these links: Safety Hook Installation or FrameKlamp Installation. Fastener hardware is not included. Please make sure the fasteners you use are appropriate for your wall.
What are the exact dimensions and weights of the boards?
For exact dimensions, add 1-1/2" to the listed board height and width. For more details about our whiteboards and for board weights, click here.
What kind of pens should I use on my board?
For best results use the Magnatag® PandaBoard® dry-erase markers provided with your board.
How do I clean my board?
For best results use the Magnatag® PandaBoard® Brand Cleaner and Conditioner with the large lint-free board wipes provided with your board. Also see care and cleaning information here.